| Term | Definition |
|---|---|
| RCVR |
Receiver |
| RECAP |
Recapitulation of the terms and conditions agreed |
| REEF |
Refrigerated |
| REVERSIBLE |
(Detention). If loading completed sooner than expected at load port, then days saved can be added to discharge operations |
| RGDS |
Regards |
| RGE |
Range |
| RNR |
Rate Not Reported |
| ROB |
Remaining On Board |
| ROC |
Reference Our Cable...(date) |
| RORO |
Roll On Roll Off Ship |
| ROTLX |
Reference Our Telex....(date) |
| RPM |
Revs. Per Minute |
| RT |
Revenue Tonne (i.e. 1.0 metric tonne or 1.0 cubic meter, whichever greater). The overall RT is calculated on a line by line basis of the Packing List using the largest amount. The overall freight liability is calculated on the total RT amount, multiplied by the freight rate |
| RYC |
Reference Your Cable....(date) |
| RYTLX |
Reference Your Telex....(date) |
|